Winter Jobs

Sailing chat

Winter Jobs

Postby ChrisR » January 2nd, 2022, 6:53 pm

I know it may be a bit pointless as fewer and fewer people are using the Forum but here goes.

2021-2022 SSC Winter Jobs.


1) Buoys cleaned and made ready for the coming year.
2) Boat parks cleaned and tidied up.
3) New Rope Spliced for the Buoys. In Hand, Our President
4) Boat securing chains checked.
5) Mast racks checked.
6) Bank below the Club cut back. (Might be a job to get someone in for. Joe Cole might be interested) Done
7) Drains cleared at the back of the Club Done
8) Concrete outside the store needs levelling. ??????
9) Ladies and Gents loos are getting very tired, may need a paint.
10) Check the felt roof for any damage.
11) Drain in the boat park below the Club needs checking.
12) Pointing front outside the gents changing room. In Hand Chris & David
13) Heaters wired in in the Ladies and Gents. In Hand John & Alan
14) Fascia’s North End of the Club need to be renewed with Plastic.
ChrisR
 
Posts: 922
Joined: December 22nd, 2009, 6:28 pm

Return to Chat

Who is online

Users browsing this forum: No registered users and 4 guests

cron
© Shanklin Sailing Club MMVI - MMXI.   Web design and racing software by Island Webservices.