I have taken some timber 6" X 1" down to the Club to use as shuttering for the concrete as well as some timber to use for the posts.

We would like to use the bit that is in the hole to go back where it came from. along the front.

We need to dig out to a depth of 8", 4" of hard core, the rubbish that is there and 4" of concrete.

It will slope many different ways, but what the heck.